|
关注:1
2013-05-23 12:21
求翻译:在施工的过程中,常会出现需要更改设计的问题。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在施工的过程中,常会出现需要更改设计的问题。
问题补充: |
|
2013-05-23 12:21:38
During the construction process, often there will be need to change the design problem.
|
|
2013-05-23 12:23:18
During the construction process, there are often need to change the design.
|
|
2013-05-23 12:24:58
In the construction process, often can appear needs to change the design the question.
|
|
2013-05-23 12:26:38
In the course of construction, often have the need to change the design problem.
|
|
2013-05-23 12:28:18
In the construction process, often can appear needs to change the design the question.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区