|
关注:1
2013-05-23 12:21
求翻译:Power supply miss-connections are also regarded as excessive conditions. Where appropriate, the EUT shall be subjected to an input from a power supply of reversed d.c. polarity or improper a.c. phase sequence for a period of 5 min. After completion of the test, and reset of the protection of the EUT, if required, the p是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Power supply miss-connections are also regarded as excessive conditions. Where appropriate, the EUT shall be subjected to an input from a power supply of reversed d.c. polarity or improper a.c. phase sequence for a period of 5 min. After completion of the test, and reset of the protection of the EUT, if required, the p
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区