求翻译:Calculation of traditional buffer basically has two kinds of methods, which were cut and paste method and root variance method. Cut and paste method referred to each procedure accumulation safety time of the critical chain, and the half of it was cut as project buffer to put at the end of the chain, so that the project是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Calculation of traditional buffer basically has two kinds of methods, which were cut and paste method and root variance method. Cut and paste method referred to each procedure accumulation safety time of the critical chain, and the half of it was cut as project buffer to put at the end of the chain, so that the project
问题补充:

  • 匿名
2013-05-23 12:21:38
传统的缓冲区的计算主要有两种方法,这是剪切和粘贴的方法和根方差法。剪切和粘贴的方法称为关键链的每个过程积累的安全时间,它的一半被削减为项目的缓冲区将在链的末端,从而使项目的项目周期是从计算表格缩短。
  • 匿名
2013-05-23 12:23:18
传统缓冲的演算基本上有两方法,是剪贴方法和根变化方法。剪贴方法提到了重要链子的每做法储积安全时刻,并且一半它被削减当项目缓冲投入在链子结束时,因此项目的项目期间从演算形式缩短。
  • 匿名
2013-05-23 12:24:58
传统缓冲的演算基本上有二方法,是剪贴方法和根变化方法。 提到的剪贴方法重要链子的毎做法储积安全时刻和一半它被削减当项目缓冲投入在链子的末端,因此项目的项目期间从演算形式缩短。
  • 匿名
2013-05-23 12:26:38
传统的缓冲区计算基本上有两种方法,其中被剪切和粘贴方法和根方差方法。剪切和粘贴方法提到的关键链,每个过程积累安全时间和它的一半被砍作为项目缓冲区放在链末端的这样,该项目的项目期间缩短从计算窗体。
  • 匿名
2013-05-23 12:28:18
传统缓冲器的计算基本上有二种方法,被裁减和粘贴方法和根本差异方法。裁减和粘贴提交到重要连锁的每段程序聚积安全时间的方法,以及它的一半被削减作为项目缓冲器放在连锁之末,以便项目的项目时期从计算形式被缩短。
 
 