当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Transformer tap change control will be effected from the Sub-station Automation System in the control room. All necessary connections, indicating auxiliary switches, relays and changeover switches to meet supervisory control requirements shall be provided and connected under this Contract to terminal blocks at the tran是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Transformer tap change control will be effected from the Sub-station Automation System in the control room. All necessary connections, indicating auxiliary switches, relays and changeover switches to meet supervisory control requirements shall be provided and connected under this Contract to terminal blocks at the tran
问题补充:

  • 匿名
2013-05-23 12:21:38
变压器分接开关的控制将从中控室子站自动化系统来实现。所有必需的连接,说明辅助开关,继电器和转换开关,以满足监控要求应提供与本合同项下连接到接线端子在变压器编组亭或柜或变压器控制柜(如适用)。
  • 匿名
2013-05-23 12:23:18
变压器轻拍变动控制从分站自动化系统将被影响在控制室。所有必要的连接,表明辅助开关,中转和转换开关符合监督控制要求将提供并且被连接根据这个合同到接线盒在变压器整理的报亭或小卧室或者在变压器控制台室,如适当。
  • 匿名
2013-05-23 12:24:58
变压器轻拍变动控制从分站自动化系统在控制室将被影响。 所有必要的连接,表明辅助开关,中转和转换开关符合监督控制要求将提供并且连接根据这个合同到接线盒在变压器整理的报亭或小卧室或者在变压器控制台室,如适当。
  • 匿名
2013-05-23 12:26:38
变压器水龙头更改控制将会影响从子站自动化系统的控制室。所有的必要的连接,指示辅助开关、 继电器和转换开关以满足要求应提供和连接到接线端子在编组亭或隔间的变压器或变压器控制柜,酌情在本合同下的监督控制。
  • 匿名
2013-05-23 12:28:18
改变者塞子改变控制将从在控制房间的子站自动化系统被实现。所有必要连接,表示辅助的开关,接力和转换切换到符合监控控制的要求将在到终端的这份合同下被提供和连接阻挡在改变者控制小房间或在跨前排列亭或小房间,如适当。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭