求翻译:Fuzzy theory can be described, if some process estimated time te, is not greater than Xa, that is less than or equal to Xa, then we say that this possibility is Z({te≤Xa }). The Z(•) was decides by the project management personnel who weigh out the risk. For example, the majority people are of the risk circumventions, 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Fuzzy theory can be described, if some process estimated time te, is not greater than Xa, that is less than or equal to Xa, then we say that this possibility is Z({te≤Xa }). The Z(•) was decides by the project management personnel who weigh out the risk. For example, the majority people are of the risk circumventions,
问题补充:

  • 匿名
2013-05-23 12:21:38
模糊理论可以被描述,如果某些过程估计时刻te,不大于XA,即小于或等于XA,那么我们说这种可能性为z({TE≤XA})。在z(•)是由决定谁掂量出风险的项目管理人才。例如,多数人是风险的规避,那么我们可能会Z({TE≤XA})= 0.9。然后根据模糊数学运算,计算XA回计算安全时间s,即如下:
  • 匿名
2013-05-23 12:23:18
模糊的理论比Xa可以被描述,如果一些过程估时te,不伟大,是小于或等于Xa,然后我们说这种可能性是Z ({te≤Xa})。Z (•)是由称出风险的项目管理人员决定。例如,多数人人民是风险绕场一周,然后我们也许做Z ({te≤Xa}) =0.9。然后根据模糊的数学操作,计算Xa回到计算安全时间S,是如下:
  • 匿名
2013-05-23 12:24:58
模糊的理论可以被描述,如果一些处理估时te,不是大于Xa,是小于或等于Xa,然后我们说这种可能性是Z(( te≤Xa ))。 Z(•) 是由称出风险的项目管理人员决定。 例如,多数人人民是风险绕场一周,然后我们也许做Z(( te≤Xa ))=0.9。 然后根据模糊的数学操作,计算Xa回到计算安全时间S,是如下:
  • 匿名
2013-05-23 12:26:38
可以描述模糊理论,如果某个进程的估计的时间 te,是不大于 Xa,那是小于或等于 Xa,然后我们说这种可能性是 Z ({te≤Xa})。Z(•) 是以权衡风险的项目管理人员作出决定。例如,多数人的风险指出,然后我们可能会使 Z ({te≤Xa}) = 0.9。然后根据模糊数学方法操作,计算出 Xa 背来计算安全时间 S,,如下所示:
  • 匿名
2013-05-23 12:28:18
模糊的理论可以被描述,如果某些过程估计时间的 te,不大于 Xa,小于或等于 Xa,然后我们说这种可能性是 Z((te(= Xa ))。Z(*) 是通过称出风险的项目管理人员决定。例如,多数的人有风险绕行,然后我们可能制作 Z((te(= Xa ))= 0.9。然后根据模糊的数学操作,计算 Xa 回到计算安全时间 S,是如下:
 
 