当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Analysis of the gravity sections, which connected the arch dam thrust blocks to the spillways on each abutment, indicated the potential for sliding along unbounded lift lines. In order to stabilize the dam against this potential failure mode, reinforced concrete overlays were added to the downstream face of the gravity是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Analysis of the gravity sections, which connected the arch dam thrust blocks to the spillways on each abutment, indicated the potential for sliding along unbounded lift lines. In order to stabilize the dam against this potential failure mode, reinforced concrete overlays were added to the downstream face of the gravity
问题补充:

  • 匿名
2013-05-23 12:21:38
重力的部分,它连接了拱坝推力块,在每个坝肩溢洪道的分析,表明为无界沿电梯线滑动的可能性。为了稳定对这种潜在的故障模式的坝,钢筋混凝土覆盖层加入到该重力段的下游面,并垂直钻孔排水是通过重力部分的上游部分处。
  • 匿名
2013-05-23 12:23:18
对重力部分的分析,连接拱坝推力块到在每扶垛的溢洪道,表明了在滑的潜力沿着无边际的推力线。为了稳定水坝反对这个潜在的故障方式,钢筋混凝土覆盖物增加到重力部分的顺流面孔,并且垂直操练的流失通过重力部分的在上游部分提供了。
  • 匿名
2013-05-23 12:24:58
对重力部分的分析,在每扶垛连接曲拱水坝推力块到溢洪道,表明了在滑的潜力沿着无边际的推力线。 为了稳定水坝反对这个潜在的故障方式,钢筋混凝土覆盖物增加到重力部分的顺流面孔,并且垂直的操练的流失通过重力部分的在上游部分提供了。
  • 匿名
2013-05-23 12:26:38
分析了重力部分,其中连接每个桥台上推力块到泄洪的拱坝,表明无界的电梯线沿滑动的可能性。为了稳定这个潜在的失效模式对大坝,钢筋混凝土覆盖被添加到重力部分中,下游面和垂直钻孔排水渠通过重力节的上游部分提供的。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭