|
关注:1
2013-05-23 12:21
求翻译:initial installation or replacement of boilers and other heat generating systems in accordance with section 13, distribution devices or hot water systems in accordance with section 14 or air-conditioning or other ambient air technology systems in accordance with section 15, must confirm in writing to the proprietor imm是什么意思? 待解决
悬赏分:1
- 离问题结束还有
initial installation or replacement of boilers and other heat generating systems in accordance with section 13, distribution devices or hot water systems in accordance with section 14 or air-conditioning or other ambient air technology systems in accordance with section 15, must confirm in writing to the proprietor imm
问题补充: |
|
2013-05-23 12:21:38
初始安装或根据第13条,按照第14条或空调或其他环境空气技术系统在按照第15条配电设备或热水系统替代锅炉等发热系统,必须以书面形式确认由他修改或安装施工或系统部件符合本条(承包人声明)的要求,工作结束后立即所有人。
|
|
2013-05-23 12:23:18
锅炉的最初安装或替换和其他供热的系统符合第13部分,发行设备或者热水系统符合第14部分或空调或者其他环境空气技术系统符合第15部分,在文字必须证实对东主在工作的结论之后他修改或安装的建筑或系统零件符合这个章程(承包商声明)的要求。
|
|
2013-05-23 12:24:58
引起系统的锅炉的最初安装或替换和其他热与第13部分符合,发行设备或者热水系统与第14部分符合或空调或者其他自由流通的空气技术系统与第15部分符合,在写道必须证实给东主在工作的结论之后,他修改或安装的建筑或系统零件集会这个章程承包商声明的 (要求)。
|
|
2013-05-23 12:26:38
初始安装或更换锅炉其他发电和供热系统按照第 13,配电装置或根据第 14 条或空调热水系统或其他环境空气技术系统根据第 15 条条必须确认后,以书面向东主立即完成的工作的施工或系统的部分修改或由他安装满足此条例 (承包者宣言 》) 的要求。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区