求翻译:Mechanical cost control: according to the construction process, a reasonable allocation of construction equipment, and to strengthen the maintenance of equipment, improve equipment utilization rate and the intact rate. For rental of equipment according to the workload of settlement, to do a good job in the original rec是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Mechanical cost control: according to the construction process, a reasonable allocation of construction equipment, and to strengthen the maintenance of equipment, improve equipment utilization rate and the intact rate. For rental of equipment according to the workload of settlement, to do a good job in the original rec
问题补充:

  • 匿名
2013-05-23 12:21:38
机械成本控制:根据施工过程中,施工设备的合理配置,并加强设备的维护,提高设备的利用率和完好率。设备根据结算的工作量,做好原始记录,结算准确租金
  • 匿名
2013-05-23 12:23:18
机械成本控制:根据建筑过程,建筑器材的合理的分派和加强设备维护,改进设备利用率和原封率。对设备租务根据解决工作量的,准确地做在原始的纪录的一个好工作,解决
  • 匿名
2013-05-23 12:24:58
机械成本控制: 根据建筑过程,建筑器材的合理的分派和加强设备维护,改进设备运用率和原封率。 为设备租务根据解决工作量,准确地做一个好工作在原始的纪录,解决
  • 匿名
2013-05-23 12:26:38
机械成本控制: 根据施工过程,施工设备,合理分配和加强设备的维修,提高设备利用率和完好率。为根据工作量的结算,要准确地做一份好的工作在原始记录、 解决设备租金