|
关注:1
2013-05-23 12:21
求翻译:Furthermore, the Contractor and the Designated Contractor shall familiarize themselves with the knowledge of the terms and conditions as well as the specification of each other's works so as to ensure the efficient interfacing of all activities between them.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Furthermore, the Contractor and the Designated Contractor shall familiarize themselves with the knowledge of the terms and conditions as well as the specification of each other's works so as to ensure the efficient interfacing of all activities between them.
问题补充: |
|
2013-05-23 12:21:38
此外,承包商和指定承建商须熟悉的条款和条件的知识,以及对方的作品的规格,以确保它们之间的所有活动的有效接入。
|
|
2013-05-23 12:23:18
此外,承包商和选定的承包商将使自己熟悉期限和条件的知识以及彼此的工作的规格以便保证高效率连接在他们之间的所有活动。
|
|
2013-05-23 12:24:58
此外,承包商和选定的承包商将使自己熟悉期限和条件的知识以及彼此的工作的规格以便保证高效率连接所有活动在他们之间。
|
|
2013-05-23 12:26:38
此外,承建商及指定承建商应熟悉条款和条件的知识,以及对方的作品,以确保它们之间的所有活动的有效接口的规范。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区