|
关注:1
2013-05-23 12:21
求翻译:the Occlusion Connection Reinforcement Technology ofφ229 large pipe-roof drilling with casing; the Excavation Technology of the cross-located right next door after disassembly type. With those advanced technologies, the whole construction of this tunnel has been completed safely and successfully.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
the Occlusion Connection Reinforcement Technology ofφ229 large pipe-roof drilling with casing; the Excavation Technology of the cross-located right next door after disassembly type. With those advanced technologies, the whole construction of this tunnel has been completed safely and successfully.
问题补充: |
|
2013-05-23 12:21:38
咬合连接加固技术与外壳ofφ229大型管道屋顶钻;后可拆式交叉位于隔壁的开挖技术。与先进的技术,这条隧道的施工全已被安全地和成功地完成。
|
|
2013-05-23 12:23:18
与框的锁柱连接增强技术ofφ229大管子屋顶钻井;跨位于的正确的隔壁的挖掘技术在拆卸类型以后的。那些先进技术,这个隧道的整个建筑安全地和顺利地完成了。
|
|
2013-05-23 12:24:58
锁柱连接增强技术ofφ229大管子屋顶钻井与框; 十字架位于的正确的隔壁的挖掘技术在拆卸类型以后。 以那些先进技术,这个隧道的整个建筑安全地和成功地完成了。
|
|
2013-05-23 12:26:38
阻塞连接加固技术 ofφ229 大管棚钻井用套管 ;开挖技术的跨-位于隔壁后拆卸类型。与那些先进的技术,整个这条隧道的建成安全、 成功。
|
|
2013-05-23 12:28:18
阻塞连接加固技术ofφ229大型管道的屋顶用套管钻井;挖掘技术的交叉隔壁拆分后键入。 与这些先进技术,整个这条隧道的兴建已完成安全成功地完成。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区