当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Uganda Railways: total length of 1350 kilometers, about 27 million passenger-km and 1,477,410,000 cargo ton kilometers. Highways: total length of 30,000 km, asphalt 3,050 km 7,100 km gravel road, the rest is dirt road. 1996 motor vehicle a total of 126,214 vehicles. Shipping: annual cargo throughput of 27,010 tons, an 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Uganda Railways: total length of 1350 kilometers, about 27 million passenger-km and 1,477,410,000 cargo ton kilometers. Highways: total length of 30,000 km, asphalt 3,050 km 7,100 km gravel road, the rest is dirt road. 1996 motor vehicle a total of 126,214 vehicles. Shipping: annual cargo throughput of 27,010 tons, an
问题补充:

  • 匿名
2013-05-23 12:21:38
乌干达铁路:1350公里,约27亿客公里,1477410000货物吨公里总长度。公路:3万公里的总长度,沥青3050公里7100公里砂石路,其余为土路。 1996机动车共126214辆。航运:年吞吐量27010吨货物,同比增长36.8%,为296,778人次,同比增长16.7%,年旅客吞吐能力;年15,624降落的飞机,同比增长24%
  • 匿名
2013-05-23 12:23:18
乌干达铁路:1350公里,大约27百万乘客km和1,477,410,000货物吨公里的总长。高速公路:30,000 km的总长,涂柏油3,050 km 7,100 km石渣路,休息是土路。1996机动车总共126,214辆车。运输:每年货物生产量27,010吨,增量36.8%;每年296,778位乘客乘客处理量,增量16.7%;年15,624登陆的航空器,增量24%
  • 匿名
2013-05-23 12:24:58
乌干达铁路: 1350公里,大约27百万乘客公里和1,477,410,000货物吨公里的总长度。 高速公路: 30,000公里的总长度,涂柏油3,050公里7,100公里石渣路,休息是土路。 1996机动车每共计126,214辆车。 运输: 每年货物生产量27,010吨,增量36.8%; 每年296,778位乘客乘客处理量,增量16.7%; 年15,624登陆的航空器,增量24%
  • 匿名
2013-05-23 12:26:38
乌干达铁路: 总长度 1350 公里,约 2700 万乘客公里和 1,477,410,000 货运吨公里。高速公路: 3 万公里,沥青 3,050 公里 7,100 公里碎石路,其余部分的总长度是土路。1996 机动车 126,214 辆车。航运: 每年的货物吞吐量 27,010 吨,增长 36.8%;每年旅客吞吐能力 296,778 人次,增长 16.7%;15,624 年着陆的飞机,增加了 24%
  • 匿名
2013-05-23 12:28:18
乌干达铁路:总长度为1350公里,约0乘客公里和1477410000货物吨公里。 公路:总长度的30000公里,沥青3050公里7100公里碎石路,其他的就是泥土路。 1996汽车一个总的126214辆汽车。 包装:每年的货物吞吐量27010吨,较上年增长36.8%;每年处理旅客的能力296778乘客,一个增加16.7%;15624年飞机降落,一个增加的24%
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭