求翻译:All Periodic Tests described in Section 5.0 of this Exhibit 5 is applicable to existing Generators in the Grid System. The Periodic Tests Schedule, timing oftests and documents submission as in paragraphs 3.1 and 3.2 shall apply. For new generator installations undergoing commissioning tests, the periodic tests in Sect是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All Periodic Tests described in Section 5.0 of this Exhibit 5 is applicable to existing Generators in the Grid System. The Periodic Tests Schedule, timing oftests and documents submission as in paragraphs 3.1 and 3.2 shall apply. For new generator installations undergoing commissioning tests, the periodic tests in Sect
问题补充:

  • 匿名
2013-05-23 12:21:38
在本次展览5第5.0所述的所有定期测试,适用于电网系统现有的发电机。定期检查排程,定时oftests和文件提交上文第3.1和3.2条适用。新的发电机安装调试进行检验,定期检验本exhibit5第5.0,应作为调试过程中的一个组成部分,并应坚持的测试时间表,测试和文档的时间段2.0 ofthis展览5提交要求万一在这个exhibit5相互矛盾的要求,相关规范本协议shal1优先;有关测试时间表,测试和提交文件的时间。尽管如此,发电机设备shal1确保符合最低要求,在马来西亚电网技术规定(2006)2.0版本说明
  • 匿名
2013-05-23 12:23:18
在这个展览5的描述的所有周期性测试第5.0部分是可适用的对在网格系统的现有的发电器。周期性测验时间表、计时的oftests和文件提议在段3.1和3.2将申请。
  • 匿名
2013-05-23 12:24:58
在这个展览5的描述的所有周期性测试第5.0部分是可适用的到现有的发电器在栅格系统。 周期性测验时间表、计时的oftests和文件提议和在段3.1和3.2将申请。 为接受投入运行试验的新的发电器设施,周期性测试在这Exhibit5的第5.0部分,在这Exhibit5在这个协议shal1将进行作为委任的过程的整体部分,并且遵守测验时间表,计时测试并且在conflicting要求的情况下提供第2.0部分ofthis展览5的提议要求,相关的规格有优先次序; 关于测验时间表,计时测试和文件提议。 但是,发电器设施shal1在马来西亚人的栅格代码2006年版本保证服从对极小的要求 (如) 陈述2.0