求翻译:The Generator FaciIity shall submit a list of settings and expected operation for each protective device and conduct off-line verification tests at site to prove that each Generator complies with the requirements on Grid Frequency variations as stated in section B2.2 of The tests shall be in acco是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Generator FaciIity shall submit a list of settings and expected operation for each protective device and conduct off-line verification tests at site to prove that each Generator complies with the requirements on Grid Frequency variations as stated in section B2.2 of The tests shall be in acco
问题补充: |
|
2013-05-23 12:21:38
发电机faciiity应当提交设置的列表和预期操作的每个保护装置,并进行离线验证测试现场证明,每台发电机符合电网频率变化的要求,在测试中第B2.2表示应在按照规定4.1.2,4.1.3和第4段的0bective,程序,并通过标准。 1.4以下。
|
|
2013-05-23 12:23:18
发电器FaciIity将递交设置名单,并且每套保护装置的期望的操作和在站点进行离线证明测试证明,每台发电器遵照在栅格频率变异的要求如测试的部分B2.2所述在依照对在段4.1.2, 4.1.3和4. 1.4下面规定的0bective、做法和通行证标准。
|
|
2013-05-23 12:24:58
发电器FaciIity为每套保护装置将递交设置和期望的操作名单并且进行离线证明测试在站点证明,每台发电器在栅格频率变异遵照要求如陈述在测试的部分B2.2在依照到在段规定的0bective、做法和通行证标准4.1.2, 4.1.3和4。 1.4下面。
|
|
2013-05-23 12:26:38
发电机的工作环境须提交一份名单的设置和预期的操作为每个防护设备和进行离线验证测试站点以证明 B2.2 测试的一节中所述将每个生成器符合对电网频率变化的要求应按照 0bective,程序,和传递标准第 4.1.2、 4.1.3、 四款的规定。1.4 下面。
|
|