|
关注:1
2013-05-23 12:21
求翻译:41 A boiler enclosure purge shall be required after the occurrence of a master fuel trip or if any purge permissive, as defined in 6.4.2.3.4.5, is lost prior to the introduction of any fuel or ignition source to the boiler enclosure.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
41 A boiler enclosure purge shall be required after the occurrence of a master fuel trip or if any purge permissive, as defined in 6.4.2.3.4.5, is lost prior to the introduction of any fuel or ignition source to the boiler enclosure.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区