当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:On 29th January 2014, around 11.30 AM Electrical contractor employee was testing a portable hand drill machine by opening electrical distribution panel with bare wires in hand. While connecting the testing lead wires to MCCB terminals arc flash took place due to short circuit between live phase terminal & metal body of是什么意思?

待解决 悬赏分:1 - 离问题结束还有
On 29th January 2014, around 11.30 AM Electrical contractor employee was testing a portable hand drill machine by opening electrical distribution panel with bare wires in hand. While connecting the testing lead wires to MCCB terminals arc flash took place due to short circuit between live phase terminal & metal body of
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
2014年1月29日,大约11.30上午电子承包商雇员通过在手中打开与光秃的导线的电子配线板测试一个便携式的手钻机器。当连接试铅导线到MCCB终端弧闪光发生了由于在活之间时的短路逐步采用终端&盘区金属身体。由于弧闪光雇员遭受了与表面烧伤对他的下巴&面颊的右手和部分。
  • 匿名
2013-05-23 12:24:58
在2014年1月29日,大约11.30上午电子承包商雇员通过在手中打开电子配线板测试一个便携式的手钻机器与光秃的导线。 当连接试铅导线到MCCB终端弧闪光发生了由于短路在活之间时逐步采用终端&盘区金属身体。 由于弧闪光雇员遭受了与表面烧伤对他的下巴&面颊的右手和部分。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭