当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译: Joint statistical processing of the values of recorded refusals of a ram and results of tests of prepared foundations by impressing loads enabled the authors to establish a correlation between the bearing capacity of foundations in rammed excavations and refusals of a ram at the end of ramming, with feted values\' of 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
 Joint statistical processing of the values of recorded refusals of a ram and results of tests of prepared foundations by impressing loads enabled the authors to establish a correlation between the bearing capacity of foundations in rammed excavations and refusals of a ram at the end of ramming, with feted values\' of
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
联合统计处理准备的基础测试的公羊和结果的记录的拒绝的价值通过铭记装载使作者建立基础公羊的承受能力在被猛撞的挖掘和拒绝的之间一种交互作用在猛撞,与高度的款待的价值\\后者被举的‘结束时。获得的交互作用可以用于在他们的建筑时监测基础轴承capcity在被猛撞的挖掘的。
  • 匿名
2013-05-23 12:24:58
联合统计处理准备的基础测试的公羊和结果的记录的拒绝的价值通过铭记装载使作者建立基础公羊的承受能力在被猛撞的挖掘和拒绝的之间一种交互作用在猛撞的结尾,以高度的款待的价值\后者被举的‘。 在他们的建筑期间,获得的交互作用在被猛撞的挖掘可以用于监测基础轴承capcity。
  • 匿名
2013-05-23 12:26:38
记录拒绝的 ram 和准备基础由铭记负载测试的结果的值的联合统计处理启用作者建立在夯实挖掘地基承载力和拒绝的末尾的撞击,盛情款待 values\ 与 ram 之间的相关性 ' 到的后者取消的高度。派生的关联可以用于在其建设过程中监视在夯实挖掘地基承载力。
  • 匿名
2013-05-23 12:28:18
联合统计处理的记录的值而被拒绝的一个RAM和测试的结果编写的基础加载启用打动的作者之间建立相互关系的承受能力的基础,撞向挖掘和拒绝一个RAM在撞毁,宴请了值\'的高度,后者都会被解除。 导出关联可用于监控轴承容量的基础在撞向挖掘工程的建设。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭