当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:  Among progressive foundation structures, a special place is occupied by foundations in rammed excavations (FRE), which improve the construction properties of base soils in the process of the work, and also i\'educe material, energy, and labor expenditures [1]. Such foundations are designed on the basis of well develo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
  Among progressive foundation structures, a special place is occupied by foundations in rammed excavations (FRE), which improve the construction properties of base soils in the process of the work, and also i\'educe material, energy, and labor expenditures [1]. Such foundations are designed on the basis of well develo
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在进步基础结构中,一个特别地方由在被猛撞的挖掘(FRE)的基础占领,在工作过程中改进基本的土壤建筑物产,并且我\\ ‘引出材料、能量和辛苦开支[1]。这样基础根据高度发达的标准[2-4]被设计;然而,在执行工作没有FRE \\ ‘s基地[5的]质量的操作的监视有效的方法。
  • 匿名
2013-05-23 12:24:58
在进步基础结构之中,一个特别地方由基础在被猛撞的挖掘FRE (占领),在工作过程中改进基本的土壤建筑物产,并且我\ ‘引出材料、能量和辛苦开支 (1)。 这样基础根据高度发达的标准被设计 (2-4); 然而,在执行工作没有FRE \ ‘s基地5的质量的操作的监视有效的方法 ()。 同时,猛撞consitutes听起来的一个特别形式基本\ ‘s土壤在是基础类似物关于它的几何学维度的一只听起来公羊帮助下。 因此,在猛撞过程中,得到交互作用连接的,例如,典型动态参数用FRE \ ‘s基地的承受能力为作为latic垂直的装载是可能的
  • 匿名
2013-05-23 12:26:38
渐进式基础结构之间一个特别的地方占领的基础夯实挖掘 (FRE),改善施工性能的基地土壤中工作,并且当 ' 引出的材料,能源,和劳动支出 [1]。这种基础的设计基于高度发达的标准 [2-4] ;然而,在开展的工作没有业务监测质量的 FRE\ 基地 [5] 的有效方法。同时,夯本身 consitutes base\ 土壤测深 ram,模拟其几何尺寸对基金会的帮助下探测的一种独特形式。因此,在夯,它是可能获得连接,例如,通过与承载能力的 FRE\ 基地的相关性乳酸垂直负载特性动态参数
  • 匿名
2013-05-23 12:28:18
基础结构在进步,一个特别的地方是在被占领的撞向挖掘基础[FRE],改善建筑属性的基本土壤在工作过程中,我有多大?”材料、能源和劳动力支出[1]。 这种基金会的基础上设计而成的发达标准[2];但是,在进行工作没有有效的方法的业务监控的质量,FRE的基础[5]。 同时,撞consitutes本身的独特形式的探空的基本的土壤,有助于一个冠冕堂皇的RAM是一种模拟的基础,对其几何尺寸。 因此,在这一进程的撞击,有可能获取动态参数特征联系在一起,例如,通过与关联的承重能力FRE\的latic作为基础垂直加载
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭