当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:One of the most important drawback was that the Smart House Living Lab of the Polytechnic University of Madrid has only two rooms, the required accuracy was meters (error less than or equal to 0,5 meters the higher score, higher than 4 meters no score) and the room accuracy was substituted by areas of interest so the b是什么意思?

待解决 悬赏分:1 - 离问题结束还有
One of the most important drawback was that the Smart House Living Lab of the Polytechnic University of Madrid has only two rooms, the required accuracy was meters (error less than or equal to 0,5 meters the higher score, higher than 4 meters no score) and the room accuracy was substituted by areas of interest so the b
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
一个最重要的缺点是马德里多科技大学的聪明的议院生存实验室只有两个房间,必需的准确性是米(错误小于或等于0,5米更高的比分,高于4米没有比分),并且室准确性由兴趣范围替代,因此我们的原型行为打算运作微行。
  • 匿名
2013-05-23 12:24:58
一个最重要的缺点是马德里多科技大学的聪明的议院生存实验室只有二个房间,必需的准确性是米 (错误小于或等于0,5米更高的比分,更加高于4米比分) 和室准确性未由兴趣范围替代,因此我们的原型行为打算运作微行。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭