当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1. completes before the construction the preparatory work project construction security preparatory work, must proceed in an orderly way, gradually, divides the stage to carry on.First is completes before the construction the investigation and study.In view of the scene terrain, the thing, the landform carry on the inv是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1. completes before the construction the preparatory work project construction security preparatory work, must proceed in an orderly way, gradually, divides the stage to carry on.First is completes before the construction the investigation and study.In view of the scene terrain, the thing, the landform carry on the inv
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
1.
  • 匿名
2013-05-23 12:24:58
1. 在建筑之前完成准备工作项目建筑安全准备工作,必须进行用一个井然方式,逐渐,划分阶段继续。首先是在建筑之前完成调查和研究。由于场面地形,事,地形继续调查,纪录,及时发现可能创造安全暗藏的危险因素。并且基于纪录,设计文件当场完成安全工作措施创立,以及场面保安警察展示运作。其次进入建筑生产准备阶段,建筑企业的管理级别,必须和容易根据建造计划有事故处所 特征,在生产开发好安全宣传、实施安全现场训练和检查,并且完成安全工作给内幕工作。
  • 匿名
2013-05-23 12:26:38
1.完成之前建设筹备工作项目施工安全筹备工作,必须进行有序的方式,逐步、 分阶段进行。第一是完成施工前的调查和研究。由于现场地形,事,地貌进行调查、 记录、 及时发现可能造成安全隐患的危险因素。并记录,在设计文件上的休息,以及现场保安警察显示工作完成成立后,在现场的安全工作措施。下一步在施工生产筹备阶段,建筑施工企业的管理水平,必须和容易有意外季度根据施工项目特点,开发好安全生产宣传,落实安全工作培训和考核,并完成安全工作交底工作。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭