求翻译:According to the cost accounting method, costs can be divided into the following categories: (1) budget. Project and budget price based on construction drawings to determine estimated project costs, reflecting for the completion of project construction and installation tasks required for the direct and indirect costs. 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the cost accounting method, costs can be divided into the following categories: (1) budget. Project and budget price based on construction drawings to determine estimated project costs, reflecting for the completion of project construction and installation tasks required for the direct and indirect costs.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
根据成本会计方法,费用可以被划分成以下类别:(1)预算。项目和根据结构图的预算价格确定估计项目费用,反射为项目对于直接和间接成本是必需的建筑和设施任务的完成。(2)实际成本。实际上在项目在建筑过程和费用对象期间和成本项目发生根据聚集生产费用的某一总和。
  • 匿名
2013-05-23 12:24:58
根据成本会计方法,费用可以被划分成以下类别: (1) 预算。 项目和根据结构图的预算价格确定估计项目费用,反射为项目为直接和间接费用需要的建筑和设施任务的完成。 (2) 实际成本。 在项目在建筑过程和费用对象期间和费用项目实际上发生根据聚集生产费用的某一总和。 (3) 目标成本。 提到企业的建筑预算建立的目标为费用,这费用在建筑被组织在项目负责人,它的潜能,技术组织作为有效的措施特许之下并且提高根据项目宗旨的被预先决定的费用的管理会计
  • 匿名
2013-05-23 12:26:38
根据成本核算的方法,成本可以分为以下几类: (1) 预算。基于施工图纸,确定估计的项目费用,反映了为完成项目施工和安装任务所需的直接费用和间接费用的项目和预算价格。(2) 实际成本。实际上发生在项目期间施工过程和成本对象和成本项目根据某一款项合计生产费用。(3) 目标成本。是指到目标设立的企业的施工预算的费用,此费用根据项目经理在建设,充分发挥其潜力的权威组织、 技术组织采取有效措施,并加强基于预先确定的项目目标成本管理会计