求翻译:Phase imbalances resulting from planned outages of transmission system elements may be permitted upon TEİAŞ’s approval, provided that sum of harmonic components does not exceed 2% such imbalances do not occur very often and they often and they do not last long. This is stated in the connection agreement between the par是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Phase imbalances resulting from planned outages of transmission system elements may be permitted upon TEİAŞ’s approval, provided that sum of harmonic components does not exceed 2% such imbalances do not occur very often and they often and they do not last long. This is stated in the connection agreement between the par
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
起因于计划的储运损耗的阶段不平衡状态传动系统元素也许被允许在TEIAȘ的认同,在调和分量的总和不超过这样不平衡状态经常不发生的2%条件下,并且他们和经常他们长期不持续。这在党之间的连接协议陈述。
  • 匿名
2013-05-23 12:24:58
起因于计划的储运损耗的阶段不平衡状态传动系统元素也许被允许在TEİAŞ的认同,在调和分量的总和不超出这样不平衡状态经常不发生的2%条件下,并且他们和经常他们长期不持续。 这在连接协议陈述在党之间。
  • 匿名
2013-05-23 12:26:38
相不平衡造成的输电系统元素的计划内停机可能允许 TEİAŞ 的经批准后,提供的谐波分量的总和不超过 2%很多时候不会发生这种不平衡和他们经常和他们做不长久。这被说在各方之间的连接协议。
  • 匿名
2013-05-23 12:28:18
第二阶段从不平衡造成的计划内停机变速箱系统元素可能允许teiaş的批准后,该笔款项提供谐波组件未超过2%这种不平衡并不经常出现,他们往往和他们不太长的。 这是说在连接协议的缔约方之间。
 
 