|
关注:1
2013-05-23 12:21
求翻译:Performing AGC duties for the purpose of load regulation in the Grid System within a range of output (minimum and maximum values) agreed between SESB (as the GSO) and the Generator Facility. The detai!s on the facilities and requirements related to AGC shall be obtained from SESB (as the GSO).是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Performing AGC duties for the purpose of load regulation in the Grid System within a range of output (minimum and maximum values) agreed between SESB (as the GSO) and the Generator Facility. The detai!s on the facilities and requirements related to AGC shall be obtained from SESB (as the GSO).
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
尽AGC职责为装载章程的目的在产品内的范围的网格系统(极小值和最大价值)同意在SESB (作为GSO)和发电器设施之间。detai! 在设施和要求的s与AGC有关从SESB将得到(作为GSO)。
|
|
2013-05-23 12:24:58
尽AGC职责为装载章程的目的在栅格系统在产品极小值和最大价值之内的 (范围) 同意在SESB (作为GSO) 和发电器设施之间。 detai! s在设施和要求与AGC有关从SESB将得到 (作为GSO)。
|
|
2013-05-23 12:26:38
在网格系统的输出 (最小和最大值) 范围内执行负载规 AGC 职务电力局 (作为地球同步轨道) 和发电机设施之间商定。德泰! s 上的设施和相关的 AGC 要求应索取电力局 (作为地球同步轨道)。
|
|
2013-05-23 12:28:18
执行自动增益控制的职责的负载调节目的的网格系统中在一定范围内的输出[最小值和最大值之间的协议],sesb[]和地球静止轨道的发生器。 困惑之处的上!S的设施和相关的要求,自动增益控制均须可从sesb[作为《公约》运作常设委员会]。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区