|
关注:1
2013-05-23 12:21
求翻译:Please confirm the injection nozzle installation of the hot runner when the mold will shipping, at present the injection nozzle is in the center of the mold ,and the another hot nozzle is installment in the mold side(vertical injection molding machine)是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Please confirm the injection nozzle installation of the hot runner when the mold will shipping, at present the injection nozzle is in the center of the mold ,and the another hot nozzle is installment in the mold side(vertical injection molding machine)
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
请证实热的赛跑者的射入喷管设施,当模子将运输时,当前射入喷管在模子的中心,并且另一热的喷管是在模子边(垂直的注坯模型机器)的就职
|
|
2013-05-23 12:24:58
请证实热的赛跑者的射入喷管设施,当模子意志运输,当前射入喷管在模子时的中心,并且另一热的喷管是就职在模子边(垂直的注坯模型机器)
|
|
2013-05-23 12:26:38
请确认的热流道注射喷嘴安装时模具将航运,目前注射机喷嘴位于中心的模具,另一个热喷嘴是安装在模具 side(vertical 注塑机)
|
|
2013-05-23 12:28:18
请确认注嘴热流道的安装在模具将航运,目前喷油嘴在模具的中心的另一个热,and注嘴是批side(vertical模具中注塑machine)
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区