当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before the first shaft bearing with angular contact ball bearing, general motors, the bearings are arranged in the inner cavity of the engine flywheel; the first axis used after bearing outer ring ball bearing retainer, the bearings bear radial load and axial load on the first shaft. For the convenience of the first sh是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before the first shaft bearing with angular contact ball bearing, general motors, the bearings are arranged in the inner cavity of the engine flywheel; the first axis used after bearing outer ring ball bearing retainer, the bearings bear radial load and axial load on the first shaft. For the convenience of the first sh
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在有有角联络滚珠轴承的,通用汽车公司第一个轴承,轴承在引擎飞轮的内在洞前被安排;在轴承外圈滚珠护圈以后使用的第一个轴,轴承负担辐形装载和轴向装载在第一个轴。为卸下,通常在轴承外圈直径以后的第一个轴方便起见比第一条轴齿轮补遗圈子直径。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭