当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Example 6. A large number of single-operation jobs are to processed on a machine. Each job requires a certain processing time and at most one job at a time can be processed on the machine; once started, the processing of a job cannot be interrupted. Now, when a given job is finished, the following job cannot be assumed是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Example 6. A large number of single-operation jobs are to processed on a machine. Each job requires a certain processing time and at most one job at a time can be processed on the machine; once started, the processing of a job cannot be interrupted. Now, when a given job is finished, the following job cannot be assumed
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
例子6.很大数量的单一操作工作是对处理在机器。每个工作需要有些处理时间,并且至多一个工作在机器可以每次被处理;一旦开始,不可能中断处理工作。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
示例 6。一大批单操作的工作是在一台机器上处理。每个作业需要某些处理时间和机器 ; 上可以处理最一作业一次一旦开始,不能中断处理一份工作。现在,当给定的作业完毕后,不能假定下面的作业只是 instanteously 开始,因为那里是 nonneglible 的 changeoever 时间参与删除 predeces sor 作业,清洗机,并将其设置为处理后续工作。此外,此转换时间是一个函数序列,即作业之间交接和 b 可能比那之间的不同 a 和 c,比 b 之间和一等......目的是要处理的所有,完成最少的时间尽可能的整个批处理作业。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭