|
关注:1
2013-05-23 12:21
求翻译:For the fired-boiler steam turbine generator, Start-up time is defined as the time taken to execute start procedures 。 from the ready to start condition of the generating p1ant in shutdown mode, which begins at receipt of notice for start (Dispatch Instruction) and ends when the generator is at 100% MCR (or CAC) loadin是什么意思? 待解决
悬赏分:1
- 离问题结束还有
For the fired-boiler steam turbine generator, Start-up time is defined as the time taken to execute start procedures 。 from the ready to start condition of the generating p1ant in shutdown mode, which begins at receipt of notice for start (Dispatch Instruction) and ends when the generator is at 100% MCR (or CAC) loadin
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区