求翻译:Start-up time for Combined Cycle full-block from the initial condition of Combined Cycle half-block (or partial block) at maximum loading; is defined as the time taken to execute start procedures from the ready to start condition of the 2nd gas turbine generator (and 3" gas turbine, if applicable), which begins at rece是什么意思?![]() ![]() Start-up time for Combined Cycle full-block from the initial condition of Combined Cycle half-block (or partial block) at maximum loading; is defined as the time taken to execute start procedures from the ready to start condition of the 2nd gas turbine generator (and 3" gas turbine, if applicable), which begins at rece