|
关注:1
2013-05-23 12:21
求翻译:存储交接计量系统 shall be complete, tested, pre-commissioned, and commissioned so that it will be operable without any interruption during initial installation and start-up. The Vendor shall be responsible and draw upon his existing, pre-engineered or standard design to satisfy the functional requirement是什么意思?![]() ![]() 存储交接计量系统 shall be complete, tested, pre-commissioned, and commissioned so that it will be operable without any interruption during initial installation and start-up. The Vendor shall be responsible and draw upon his existing, pre-engineered or standard design to satisfy the functional requirement
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Storage transfer metering system shall be complete, tested, and pre-commissioned, commissioned and so that it will be operable without any interruption during initial installation and start-up. The Vendor shall be responsible and draw upon his existing, pre-engineered or standard design to satisfy t
|
|
2013-05-23 12:24:58
Memory connection measurement system shall be complete, tested, pre-commissioned, and commissioned so that it will be operable without any interruption during initial installation and start-up. The Vendor shall be responsible and draw upon his existing, pre-engineered or standard design to satisfy t
|
|
2013-05-23 12:26:38
Custody transfer metering system shall be stored complete, tested, pre-commissioned, and commissioned so that it will be operable without any interruption during initial installation and start-up. The Vendor shall be responsible and draw upon his existing, pre-engineered or standard design to satisf
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区