当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In soft,partially saturated, or fully saturated soil, the tunnel construction process causes short- and long-term ground deformations resulting from the disturbance of the virgin stress state of the soil and the changing pore water conditions resulting from the interactions between the soil constituents—soil grains, po是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In soft,partially saturated, or fully saturated soil, the tunnel construction process causes short- and long-term ground deformations resulting from the disturbance of the virgin stress state of the soil and the changing pore water conditions resulting from the interactions between the soil constituents—soil grains, po
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在软,部分地饱和的或者充分地饱和的土壤,隧道建筑过程导致短期与长期的地面变形起因于土壤和改变的水孔条件的处女重音状态的干扰起因于土壤组成部分土壤五谷、水孔和空和支持方法之间的互作用。
  • 匿名
2013-05-23 12:24:58
在软,部份地饱和的或者充分地饱和的土壤,隧道建筑过程导致短小和长期地面变形起因于土壤和改变的水孔条件的处女重音状态的干扰起因于土壤组成部分土壤五谷、水孔和空气和援助方案之间的互作用。
  • 匿名
2013-05-23 12:26:38
在软的、 部分饱和的或完全饱和土隧道施工过程会导致-和长短期地面变形产生的土壤和不断变化的处女应力状态扰动的孔隙水条件引起的土壤成分之间的相互作用 — — 土壤颗粒、 孔隙水和空气 — — 和支持措施。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭