|
关注:1
2013-05-23 12:21
求翻译:Bond coats shall be applied to the concrete substrate and the primed reinforcement as soon as possible after the reinforcement primer has cured sufficiently. 100% coverage shall be achieved but care shall be taken to avoid covering too large area at any one time to ensure the repair material is applied during the open 是什么意思?![]() ![]() Bond coats shall be applied to the concrete substrate and the primed reinforcement as soon as possible after the reinforcement primer has cured sufficiently. 100% coverage shall be achieved but care shall be taken to avoid covering too large area at any one time to ensure the repair material is applied during the open
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
在增强底漆十分后地,治疗了初层将尽快被应用于具体基体和填装的增强。100%覆盖面将达到,但是将保重避免随时包括太大面积保证修理材料是应用的在初层的开放时期。
|
|
2013-05-23 12:24:58
在增强底漆充足地之后,治疗了得初层将尽快被应用于具体基体和填装的增强。 100%覆盖面将达到,但将保重避免随时包括太大面积保证修理材料是应用的在初层的开放时期。
|
|
2013-05-23 12:26:38
债券大衣适用于混凝土基体和尽快的引物的加固加固底漆已足够痊愈后。应达到 100%的覆盖率,但应小心,避免在任何一次,以确保修复材料在债券外套的营业时间期间应用面积太大。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区