|
关注:1
2013-05-23 12:21
求翻译:In addition, as for the risk measures, it is necessary performing based on the consideration of the priority from the effectiveness and limited input resources, and to perform “reception, imputation, reduction and evasion” four risk measures correspond to the result of risk analysis as the TQM matrix as shown in Figure是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In addition, as for the risk measures, it is necessary performing based on the consideration of the priority from the effectiveness and limited input resources, and to perform “reception, imputation, reduction and evasion” four risk measures correspond to the result of risk analysis as the TQM matrix as shown in Figure
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
另外,至于为风险措施,它是根据优先权的考虑的必要执行从有效率和被限制的输入资源的,如图4.所显示,并且执行“招待会,归咎、减少和躲避”四项风险措施对应于风险分析的结果作为TQM矩阵。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
此外,至于风险的措施,它是有必要执行基于优先的考虑,从效力和输入的资源有限,并执行"接待、 归责,减少和规避"四个风险措施对应的风险分析的结果,作为全面质量管理矩阵如图 4 所示。
|
|
2013-05-23 12:28:18
此外,作为风险的措施,执行上的考虑优先的效力和受限的输入资源,并执行“接待、估算、减少和规避”四个风险措施的结果相对应的风险分析作为TQM矩阵如图4所示。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区