当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Drill program totalling 950 m (7,300 m drilling completed in 2012), including 250 m hydro geology drilling at the C2 deposit to test encouraging IP anomalies at depth and to west of prospect line 59, where existing drill spacing was 160 m. Infill drilling has the potential to double the current resources是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Drill program totalling 950 m (7,300 m drilling completed in 2012), including 250 m hydro geology drilling at the C2 deposit to test encouraging IP anomalies at depth and to west of prospect line 59, where existing drill spacing was 160 m. Infill drilling has the potential to double the current resources
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
2012年共计950 m的 (钻子节目7,300 m钻井完成),包括250 m与氢结合的地质钻井在C2储蓄测试鼓励的IP反常现象在深度和对在远景线59西边,现有的钻子间距是160 m.的地方。 填入的钻井有潜力加倍当前资源
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭