求翻译:In order to avoid excessive widening in high fills it is proposed, as long as the minimum cover above culverts is still adequate, to excavate the existing road in order to obtain the required platform width to allow the rehabilitation.是什么意思?![]() ![]() In order to avoid excessive widening in high fills it is proposed, as long as the minimum cover above culverts is still adequate, to excavate the existing road in order to obtain the required platform width to allow the rehabilitation.
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
为了避免过份加宽在高积土提议,只要在阴沟上的极小覆盖是充分的,挖掘现有的路为了得到必需的平台宽度允许修复。
|
|
2013-05-23 12:24:58
为了避免过份加宽在高积土它提议,只要极小覆盖在阴沟之上是充分的,挖掘现有的路为了得到必需的平台宽度允许修复。
|
|
2013-05-23 12:26:38
为了避免过度扩大,高填充它被提议,只要以上涵洞的最低保险是仍足以挖掘现有路面以获得所需的平台宽度允许康复。
|
|