当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:基坑开挖,按照设计高程开挖基坑,没变多开挖50cm,以便安装模板。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基坑开挖,按照设计高程开挖基坑,没变多开挖50cm,以便安装模板。
问题补充:

  • 匿名
2013-05-23 12:21:38
Excavation, the excavation pit according to the design elevation, the excavation has not changed more than 50cm, in order to install the template.
  • 匿名
2013-05-23 12:23:18
Digging pit, in accordance with the design elevation dig pit digging, unchanged over 50 cm in order to install templates.
  • 匿名
2013-05-23 12:24:58
Structure excavation, excavates the hole excavated for building foundation according to the design elevation, has not changed excavates 50cm, in order to install the template.
  • 匿名
2013-05-23 12:26:38
Excavation, according to the design height of excavation of Foundation pit, excavation 50cm hasn't changed much in order to install template.
  • 匿名
2013-05-23 12:28:18
Structure excavation, excavates the hole excavated for building foundation according to the design elevation, has not changed excavates 50cm, in order to install the template.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭