|
关注:1
2013-05-23 12:21
求翻译:The results of the study showed that unplanned compressor unit outages on a high electric generation day can potentially have an impact on PG&E’s ability to reliably serve power plants, but having storage fields on standby and ready to withdraw can mitigate much of the risk of unplanned unit outages.是什么意思?![]() ![]() The results of the study showed that unplanned compressor unit outages on a high electric generation day can potentially have an impact on PG&E’s ability to reliably serve power plants, but having storage fields on standby and ready to withdraw can mitigate much of the risk of unplanned unit outages.
问题补充: |
|
2013-05-23 12:21:38
该研究的结果表明,在高的发电天无计划压缩机单元中断可以潜在地对PG&E的可靠服务的发电厂的能力产生影响,但具有处于待命状态,并准备退出存储字段可以减轻多无计划单元的风险
|
|
2013-05-23 12:23:18
研究的结果表示,无计划的压缩机单位储运损耗在一高电一代天可能潜在地有对PG&E的能力的冲击可靠地服务能源厂,但是有在备用的存贮领域和准备好让步可能缓和许多无计划的单位储运损耗的风险。
|
|
2013-05-23 12:24:58
研究的结果表示,无计划的压缩机单位储运损耗在一高电世代天可能潜在地有对PG&E的能力的冲击可靠地服务能源厂,但有存贮领域在备用和准备好让步可能缓和许多无计划的单位储运损耗的风险。
|
|
2013-05-23 12:26:38
研究的结果表明,计划外的压缩机组高电代天停电的影响有可能对 PG & E 能够可靠地服务于电厂、 但有待机状态存储领域产生影响并准备撤回可以减轻很多单位计划外的停机的风险。
|
|
2013-05-23 12:28:18
研究的结果显示有关一正盛电气一代日的未计划的压缩器单位储运损耗可能很可能对 PG&E 的能力有影响可靠地服务发电厂,但是有存储地待命和准备好撤离可以减轻大部分未计划的单位储运损耗的风险。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区