|
关注:1
2013-05-23 12:21
求翻译:As it was mentioned in Section 2 that during pre-conditioning period the hot water was flown through the collector pipe to achieve a certain uniform initial high temperature of the absorber plate and pipe, therefore, for negligible thermal resistance of the bond between the absorber pipe and plate,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
As it was mentioned in Section 2 that during pre-conditioning period the hot water was flown through the collector pipe to achieve a certain uniform initial high temperature of the absorber plate and pipe, therefore, for negligible thermal resistance of the bond between the absorber pipe and plate,
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区