|
关注:1
2013-05-23 12:21
求翻译:The strategic structure of OM capabilities is given in Table 10, and it has been used to evaluate OM capabilities. As summarized in the table, it was found from the questionnaire survey that the total weighted score of OM capabilities is higher than those of RPM capabilities at Beta. This result reflected the situation是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The strategic structure of OM capabilities is given in Table 10, and it has been used to evaluate OM capabilities. As summarized in the table, it was found from the questionnaire survey that the total weighted score of OM capabilities is higher than those of RPM capabilities at Beta. This result reflected the situation
问题补充: |
|
2013-05-23 12:21:38
的OM功能的战略结构列于表10中,它已被用于评价OM能力。
|
|
2013-05-23 12:23:18
OM能力战略工事在表10被给,并且它用于评估OM能力。如总结桌,从问卷调查被找到OM能力共计加权评分高于那些RPM能力在beta。这个结果反射了beta在它的OM结构和操作很好做了的情况。
|
|
2013-05-23 12:24:58
OM能力战略工事在表10被给,并且它用于评估OM能力。 如总结在桌里,它从查询表调查被发现了OM能力总被衡量的比分那些高于RPM能力在beta。 这个结果反射了beta在它的OM结构和操作很好做了的情况。
|
|
2013-05-23 12:26:38
OM 能力的战略结构给予在表 10 中,它被用来评估 OM 能力。如汇总表中,它被发现从问卷调查 OM 能力的总加权的分数是高于那些 RPM 在 beta 版的功能。这个结果反映测试版已经做得很好其 OM 结构和运作的情况。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区