当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Based on the indication in Fig. 13, the study team further proposed that, in terms of the growth of RPM capabilities and the four maturity levels, Beta needs to improve its RM performance in key areas including Risk monitoring and Risk response, in addition to the control and continuous improvement in the key area of R是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Based on the indication in Fig. 13, the study team further proposed that, in terms of the growth of RPM capabilities and the four maturity levels, Beta needs to improve its RM performance in key areas including Risk monitoring and Risk response, in addition to the control and continuous improvement in the key area of R
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
基于在图13的征兆,学习小组在关键区进一步提议,根据RPM能力和四个成熟水平成长, beta需要改进它的RM表现包括风险监测和风险反应,除控制和连续的改善之外在风险分析和评估关键区,也是需要一个计划的改善。
  • 匿名
2013-05-23 12:24:58
基于征兆在。 13,学习小组进一步提议,根据RPM能力和四个成熟水平成长, beta需要改进它的RM表现在关键区包括风险监视和风险反应,除控制和连续的改善之外在风险分析和评估关键区,也是需要一个计划为改善。 同时,为OM能力,关键区包括节目RM和风险文化支持也有对改善的需要。
  • 匿名
2013-05-23 12:26:38
基于图 13 中的征兆,研究小组进一步建议 RPM 的能力和四个成熟度级别,beta 版需要改进的关键领域包括风险监测和风险响应,以及控制和持续改进的关键领域中的风险分析和评价,其 RM 性能增长,需要有一个计划改进太。同时,对于 OM 功能,还包括程序 RM 和风险文化支持的关键领域了需要改进。
  • 匿名
2013-05-23 12:28:18
根据在无花果中的表征。13,研究小组进一步提议就 RPM 能力的成长和四种成熟水平而言, Beta 需要改善其包括监测的风险在主要地区方面的 RM 表现,冒险答复,除了控制和在风险分析和评估的主要地区的连续改进,也需要有关改进的一个计划。同时,对 OM 能力,包括程序的主要地区 RM 和风险文化支持也需要改进。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭