当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In 1994, the Swedish National Rail Administration (Banverket) and the City of Stockholm called for an international competion for the design of a new bridge. Among the entries, a concrete bridge designed using COWI's Integrated Bridge Design and Analysis System was selected. With the in-house developed software, it was是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In 1994, the Swedish National Rail Administration (Banverket) and the City of Stockholm called for an international competion for the design of a new bridge. Among the entries, a concrete bridge designed using COWI's Integrated Bridge Design and Analysis System was selected. With the in-house developed software, it was
问题补充:

  • 匿名
2013-05-23 12:21:38
1994年,瑞典国家铁路管理局( Banverket )和斯德哥尔摩市呼吁国际competion为一座新的桥梁设计。
  • 匿名
2013-05-23 12:23:18
在1994年,瑞典全国路轨管理(Banverket)和市斯德哥尔摩要求一座新的桥梁的设计的国际竞争。在词条中,使用COWI的集成桥梁设计和分析系统被设计的一座具体桥梁被选择了。机构内部的被开发的软件,自动地引起布置图,展示数据,数量,分析模型并且分析结果,因而保证高度数据完整性是可能的。
  • 匿名
2013-05-23 12:24:58
1994年,瑞典全国路轨管理 (Banverket) 和国际竞争斯德哥尔摩要求市为一座新的桥梁的设计。 在词条之中,一座具体桥梁设计了使用COWI的集成桥梁设计,并且分析系统被选择了。 与机构内部的被开发的软件,自动地引起布置图,展示数据,数量,分析模型并且分析结果,因而保证高度数据完整性是可能的。 设计的跟随的完成, 2000年建筑开始了。 超结构为新的桥梁被修建了用二别的方法。 从北部,常规固定的脚手架使用了,而,从南,发射的模板使用了。 当科技目前进步水平技术, 2005年被修建完成了,并且在2005年8月28日正式地打开桥梁充分交易。
  • 匿名
2013-05-23 12:26:38
1994 年,瑞典国家铁路管理局 (Banverket) 和斯德哥尔摩市要求设计一座新桥的国际竞争。其中的条目,使用 COWI 的综合桥梁设计与分析系统设计的混凝土桥梁被选择了。与内部开发的软件,它是完整性的可能自动生成布局图纸、 放样数据、 数量、 分析模型和分析结果,从而保证数据程度高。完成后的设计,在 2000 年开始建设。新大桥上部结构是在两种不同方式兴建的。从北部,常规固定的脚手架使用了,而来自南方,启动模板使用了。与先进的技术,建成于 2005 年完成和大桥正式建成通车充分在 2005 年 8 月 28 日。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭