当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:With the development of prestressing technology, steel strand first should the hollow plate beam of prestressed concrete get in the upper part structure of the highway bridge extensive application, to steel strand first should prestressed concrete hollow plate beam construction quality of quality, not only direct relat是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With the development of prestressing technology, steel strand first should the hollow plate beam of prestressed concrete get in the upper part structure of the highway bridge extensive application, to steel strand first should prestressed concrete hollow plate beam construction quality of quality, not only direct relat
问题补充:

  • 匿名
2013-05-23 12:21:38
随着预应力技术的发展,钢绞线首先应预应力混凝土空心板梁获得在公路桥梁广泛应用的上部结构,钢绞线首先应预应力混凝土空心板梁施工质量的质量,不仅直接关系
  • 匿名
2013-05-23 12:23:18
首先预加应力技术的发展,钢子线应该钢筋混凝土空心板材射线在高速公路桥梁广泛的应用的上部结构得到,对首先钢子线应该钢筋混凝土凹陷板材射线质量的建筑质量,不仅直接联系到达正常用法桥梁,联系同时也到达安全程度和耐久性桥梁。
  • 匿名
2013-05-23 12:24:58
以首先预加应力技术的发展,钢子线应该钢筋混凝土空心板材射线在高速公路桥梁广泛的应用的上部结构得到,对首先钢子线应该钢筋混凝土凹陷板材射线质量的建筑质量,不仅直接联系到达正常用法桥梁,联系同时也到达安全程度和耐久性桥梁。 所以熟悉在射线系统首先做过程以控制建筑一种工艺以工作井质量管理钥匙是非常。 这个文本组合建筑到实践,对钢子线首先应该钢筋混凝土凹陷板材射线建筑工艺,质量管理等问题做介绍。 © (2012) Trans技术出版物,瑞士
  • 匿名
2013-05-23 12:26:38
预应力技术的发展,与钢绞线首先应预应力混凝土空心板梁先在公路桥梁广泛应用于钢绞线的上部结构应预应力混凝土空心板梁施工质量的质量,不只直接关系到桥梁的正常使用,也同时关系到桥梁的安全程度和持久。因此熟悉在梁体系与控制的进程,使第一次施工工艺与工作质量控制是非常的关键。此文本结合建设到实践,钢绞线首先应预应力混凝土空心板梁施工工艺、 质量控制等问题作了介绍。© (2012) 跨技术出版物、 瑞士
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭