|
关注:1
2013-05-23 12:21
求翻译:Pile, the construction unit should be familiar with the geological survey reports, master of engineering geological conditions of the site, and the test pile to determine the appropriate construction equipment and configuration. The pile driving process in case of unusual circumstances, or does not是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Pile, the construction unit should be familiar with the geological survey reports, master of engineering geological conditions of the site, and the test pile to determine the appropriate construction equipment and configuration. The pile driving process in case of unusual circumstances, or does not
问题补充: |
|
2013-05-23 12:21:38
桩,施工单位应熟悉地质勘察报告,工程硕士现场的地质条件,与试桩,以确定合适的施工设备和配置。
|
|
2013-05-23 12:23:18
堆,建筑单位应该熟悉地质勘测设计站点的地质情况报告、大师和测试堆确定适当的建筑器材和配置。在异常的情况的情况下打桩过程或者不
|
|
2013-05-23 12:24:58
堆,建筑单位应该熟悉地质勘测站点的工程学地质情况报告、大师和确定适当的建筑器材和配置的测试堆。 打桩过程在异常的情况的情况下或者不
|
|
2013-05-23 12:26:38
桩,施工单位应熟悉地质调查的报告,主站点和测试桩来确定适当的建筑设备与配置的工程地质条件。打桩过程发生异常情况或不
|
|
2013-05-23 12:28:18
堆,建造单位应该熟悉地质调查报告,设计地点的地质条件的主人,以及确定适当的建造设备和配置的测试堆。堆操纵的过程以防不寻常的情况,或不
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区