|
关注:1
2013-05-23 12:21
求翻译:Project under construction shall be accounted based on actual cost. Fixed asset accounting method shall be adopted when the project under construction reaches expected use situation.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Project under construction shall be accounted based on actual cost. Fixed asset accounting method shall be adopted when the project under construction reaches expected use situation.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区