求翻译:The CONTRACTOR start-up and commissioning team shall ensure that the construction is completed in correct sequence by systems, all commissioning inspections and tests are conducted satisfactorily and all necessary certificates and documents are completed for acceptance after the successful trial runs, 72 hours performa是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The CONTRACTOR start-up and commissioning team shall ensure that the construction is completed in correct sequence by systems, all commissioning inspections and tests are conducted satisfactorily and all necessary certificates and documents are completed for acceptance after the successful trial runs, 72 hours performa
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商的启动和调试队伍应确保施工是由系统完成正确的顺序,所有的调试检验和试验圆满进行,所有必要的证件和文件完成验收的成功试运行后, 72小时性能测试和
  • 匿名
2013-05-23 12:23:18
承包商起动和委任队保证建筑在正确序列完成由系统,所有委任的检查,并且测试令人满意地进行,并且所有必要的证明和文件为采纳完成在成功的试航、72个小时性能测试和90天可靠性试验奔跑以后
  • 匿名
2013-05-23 12:24:58
承包商起动和委任队保证建筑在正确序列完成由系统,所有委任的检查,并且测试令人满意地进行,并且所有必要的证明和文件为采纳完成在成功的试航、72个小时性能测试和90天可靠性试验奔跑以后
  • 匿名
2013-05-23 12:26:38
承建商试车和试运行团队应确保建设由系统完成正确的顺序、 令人满意地进行所有的调试的检查和测试后成功试运行验收完成了所有必要的证书和文件、 72 小时的性能测试和 90 天运行可靠性测试
  • 匿名
2013-05-23 12:28:18
承包商启动和委托小组将确保建造在系统,所有委托检验和测试旁边在正确顺序方面完成满意地和都被召开必要证书和文件成功的审讯跑后为接受完成, 72 小时的表现测试和 90 天可靠性测试跑
 
 