|
关注:1
2013-05-23 12:21
求翻译:ality problems were costly for IPC. A number of Branco’s orders had included defective cartons due to overlapping flans. Nonconformance problems such as this were typically not identified, until a production run had started and equipment stalls occurred. Production used a fully automated line process, and a stall at on是什么意思? 待解决
悬赏分:1
- 离问题结束还有
ality problems were costly for IPC. A number of Branco’s orders had included defective cartons due to overlapping flans. Nonconformance problems such as this were typically not identified, until a production run had started and equipment stalls occurred. Production used a fully automated line process, and a stall at on
问题补充: |
|
2013-05-23 12:21:38
先进而精湛的问题是昂贵的工控机。
|
|
2013-05-23 12:23:18
ality问题为IPC是昂贵的。一定数量的Branco的定货包括瑕疵纸盒由于重叠的果馅饼。不服从问题例如此未典型地辩认,直到生产运行开始了,并且设备摊位发生了。生产使用了一条充分地自动化的线过程,并且一个摊位在一个末端始终导致减速。由于瑕疵纸盒不会影响对顾客IPC的成品继续播映为了赶上顾客最后期限。
|
|
2013-05-23 12:24:58
ality问题为IPC是昂贵的。 一定数量的Branco的定货包括瑕疵纸盒由于重叠的果馅饼。 不服从问题例如此未典型地辩认,直到生产运行开始了,并且设备摊位发生了。 生产使用了一条充分地自动化的线过程,并且一个摊位在一个末端始终导致减速。 由于瑕疵纸盒不会影响最后产物对顾客IPC继续播映为了遇见顾客最后期限。 然而瑕疵包装纸盒的最后Branco发货导致30%产量损失为一整个天的 (二转移) 生产。 在充分的生产, IPC跑了每个小时2,000个纸盒,与三名操作员在$18每个小时中的每一个
|
|
2013-05-23 12:26:38
质量问题是 IPC 的代价。布兰科的订单数包括由于重叠 flans 有缺陷纸箱。不符合这种,这通常不确定,直到已开始生产运行和设备档时出现问题。生产中使用的完全自动化的生产线流程,和另一端的一档导致整个经济的放缓。因为有缺陷的纸箱不会影响最终产品向客户 IPC 继续运行以满足客户的最后期限。然而最后布兰科装运包装纸箱有缺陷导致整个天 (两班) 生产的 30%生产损失。在完整的生产,IPC 跑了 2000 箱每小时,与三大运营商在每小时每个 18 元
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区