|
关注:1
2013-05-23 12:21
求翻译:Punching and drilling shall be done by methods designed to ensure accuracy. The center of any hole shall not vary more than 1.5 mm from its position neither shall the center to center distance of end holes in a group of holes vary by more than 1.5 mm. Plugging and welding of drilled holes shall not be permitted.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Punching and drilling shall be done by methods designed to ensure accuracy. The center of any hole shall not vary more than 1.5 mm from its position neither shall the center to center distance of end holes in a group of holes vary by more than 1.5 mm. Plugging and welding of drilled holes shall not be permitted.
问题补充: |
|
2013-05-23 12:21:38
冲孔,钻孔,由设计,以确保准确的方法来完成。
|
|
2013-05-23 12:23:18
猛击和操练将由方法完成被设计保证准确性。任何孔的中心不会变化超过从它的位置的1.5 mm两者都不对中心距的中心在一个小组的末端孔孔将由超过1.5 mm变化。塞住和焊接操练的孔不会被允许。
|
|
2013-05-23 12:24:58
猛击和钻井将由被设计的方法完成保证准确性。 任何孔的中心不会变化超过1.5毫米从它的位置两者都不中心到中心距末端孔在一个小组孔将由超过1.5毫米变化。 塞住和焊接操练的孔不会被允许。
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
用拳猛击和操练将按方法完成设计确保准确性。任何孔的中心不将距其位置多于 1.5 毫米变化中心也不会集中距离的终止在一批孔打洞 因多于 1.5 毫米而异。插入和被钻的孔的焊接不将被允许。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区