求翻译:Fig. 1. Results of static tests on 12-m piles of different designs, a) For vertical load; b) for horizontal load; 1) driven pile with 35 × 35 cm cross section; 2) predrilled-and rammed piles with 60-em shaft diameter; 3) predrilled-and-rammed piles with 60-cm shaft diameter with pedestal tapered to 160 cm; 4) predrill是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Fig. 1. Results of static tests on 12-m piles of different designs, a) For vertical load; b) for horizontal load; 1) driven pile with 35 × 35 cm cross section; 2) predrilled-and rammed piles with 60-em shaft diameter; 3) predrilled-and-rammed piles with 60-cm shaft diameter with pedestal tapered to 160 cm; 4) predrill
问题补充: |
|
2013-05-23 12:21:38
图。
|
|
2013-05-23 12:23:18
图1.静态测试的结果对12-m堆的不同的设计, a)垂直的装载的;水平的装载的b);1)与35 × 35 cm横断面的被驾驶的堆;2)预演练和与60 em轴直径的被猛撞的堆;3)与60 cm轴直径的预演练和被猛撞的堆与垫座逐渐变细到160 cm;4)与100 cm轴直径的预演练和被猛撞的堆。
|
|
2013-05-23 12:24:58
。 1. 静态测试的结果对12-m堆的不同的设计, a) 为垂直的装载; b) 为水平的装载; 1) 被驾驶的堆以35 × 35 cm横断面; 2) predrilled和被猛撞的堆与60em轴直径; 3) predrilled和猛撞堆与60cm轴直径与垫座逐渐变细到160 cm; 4) predrilled和猛撞堆与100cm轴直径。
|
|
2013-05-23 12:26:38
图 1。不同的设计,12-m 桩上的静态测试的结果) 的垂直负荷 ;b) 为水平荷载 ;1) 与 35 × 35 cm 桩截面 ;2) 钻孔-和夯扩的桩 60 em 轴直径 ;3) 钻孔-和-撞向桩的基座圆锥到 160 厘米 ; 60 厘米轴直径4) 钻孔-和-撞向 100 厘米轴直径桩。
|
|