当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Note. The material outlay for the piling was obtained from designs developed by the State Institute for the Design and Planning of Beds and Foundations, while the pile costs were taken from an objective estimate from which computations were made for a client.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Note. The material outlay for the piling was obtained from designs developed by the State Institute for the Design and Planning of Beds and Foundations, while the pile costs were taken from an objective estimate from which computations were made for a client.
问题补充:

  • 匿名
2013-05-23 12:21:38
请注意。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
笔记。 物质费用额为打桩从状态学院开发的设计获得了为床和基础设计和计划,而堆费用从计算为客户被做的一个客观估计被采取了。
  • 匿名
2013-05-23 12:26:38
请注意。打桩工程的材料费用被获得由国家研究所开发设计和规划的床和基础,而从客观的估计从其计算作了一个客户端被采取了桩成本的设计。
  • 匿名
2013-05-23 12:28:18
注意。对于桩的材料投入从由用于设计的州学院所开发的设计被获取和以床和基础制定计划,当堆的费用从从其计算为一位客户所做的一个客观估计被送时。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭