|
关注:1
2013-05-23 12:21
求翻译:Flow-actuated underreaming in MPD operations also requires proper attention and planning in the same way as for RSS and must be clearly discussed with the MPD and underreamer contractors. A float valve above the underreamer is an absolute requirement in MPD operations to avoid pressure communication to the drillstring.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Flow-actuated underreaming in MPD operations also requires proper attention and planning in the same way as for RSS and must be clearly discussed with the MPD and underreamer contractors. A float valve above the underreamer is an absolute requirement in MPD operations to avoid pressure communication to the drillstring.
问题补充: |
|
2013-05-23 12:21:38
在MPD业务流程驱动的扩孔也需要适当的重视和规划以同样的方式作为对RSS ,必须与MPD和扩孔承建商讨论清楚。
|
|
2013-05-23 12:23:18
流程开动的underreaming在MPD操作以与对RSS相似的方式也要求适当的关注和计划,并且必须与MPD和underreamer承包商明显地谈论。在underreamer上的一个浮球阀是在MPD操作的一个绝对要求避免压力通信对钻具组。
|
|
2013-05-23 12:24:58
流动开动的underreaming在MPD操作也要求适当的关注和计划,以与为RSS,并且必须与MPD和underreamer承包商相似的方式清楚地谈论。 浮门在underreamer之上是一个绝对要求在MPD操作避免压力通信到drillstring。
|
|
2013-05-23 12:26:38
流驱动扩 MPD 行动中也需要给予应有的重视和规划在 RSS 相同的方式,必须与 MPD 和 underreamer 承建商清楚地讨论了。Underreamer 以上的浮阀是在 MPD 行动中的绝对要求,以避免发生对钻柱压力沟通。
|
|
2013-05-23 12:28:18
流动促使在 MPD 操作方面的过低撇去表面奶油也需要正确注意和在相同的方法方面制定计划至于 RSS 和必须清楚地用 MPD 和 underreamer 承包商讨论。在 underreamer 上的一个浮漂阀门是在 MPD 操作中的一个绝对要求避免压力通信对于 drillstring。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区