|
关注:1
2013-05-23 12:21
求翻译:This thesis introduces the current situation and prospects of the cable-stayed bridge and summarized the main methods of the construction for the main girder of cable-stayed bridge. The main construction method is cantilever construction, the main tool of which is movable suspended scaffolding. Through doing some resea是什么意思? 待解决
悬赏分:1
- 离问题结束还有
This thesis introduces the current situation and prospects of the cable-stayed bridge and summarized the main methods of the construction for the main girder of cable-stayed bridge. The main construction method is cantilever construction, the main tool of which is movable suspended scaffolding. Through doing some resea
问题补充: |
|
2013-05-23 12:21:38
本文介绍了当前的形势和斜拉桥的前景,并总结了施工的斜拉桥主梁的主要方法。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
这份论文介绍缆绳被停留的桥梁的当前形势和远景并且总结了建筑的主要方法为缆绳被停留的桥梁主要大梁。 主要建筑方法是悬臂式建筑,主要工具,其中是可移动的暂停的脚手架。 通过做对暂停的脚手架的结构的特征和物产的一些研究,我在暂停的脚手架总结有些结论关于技术的适用性。
|
|
2013-05-23 12:26:38
这份论文介绍了当前形势和前景的斜拉桥索和总结的斜拉桥主梁施工的主要方法。主要施工方法是悬臂施工,其中的主要工具是动产暂停的脚手架。通过做的特征和悬浮脚手架的结构性能的一些研究,我得出了一些结论适用性的技术暂停脚手架上。
|
|
2013-05-23 12:28:18
这个论题提出当前形势和电缆阻止的桥的探矿和总结电缆阻止的桥主要梁建造的主要方法。主要建造方法是悬梁建造,对哪个是可移动悬吊给人支脚手架的主要工具。通过在特征上做某些调查以及结构的财产暂停给支脚手架,我关于技术的可用性得出一些结论上暂停给支脚手架。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区