|
关注:1
2013-05-23 12:21
求翻译:All controls to be installed, calibrated and adjusted by trained instrument technicians in the full-time employ of the Automatic Temperature Controls Contractor. The ATC Contractor shall not subcontract this work in whole or in part to another contractor or individual(s).是什么意思? 待解决
悬赏分:1
- 离问题结束还有
All controls to be installed, calibrated and adjusted by trained instrument technicians in the full-time employ of the Automatic Temperature Controls Contractor. The ATC Contractor shall not subcontract this work in whole or in part to another contractor or individual(s).
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区